TrainReset:There are many trains need to drive out of the station .In terms of their numbers from small to large.There are only three railways used to place the trains ,and also need the same order.
This a JavaBean application, which contains 4 beans. In this package, There are 4 files:
cexchange.jar(ready to load into BeanBuilder),
readme.txt,
currencyData.txt(data file),
screenshot.jpg(linking beans)
use double link list to implenment memory allocation. There won t appear maloc, new, delete, in my code. All is using freelist to find a suitable memory space.
It s my own design .There are s3c44b0x and atl8019 in the design. it is original so need be improved.you can open it with protel 99se!
I great appreciate your use!
There are some newly released Neural Network Example Programs for Character Recognition, which based on Image Processing Toolbox,Neural Network Toolbox in MATLAB, which is quite informative for the beginners in Neural networks applicators
There is an example of how to use the LDPC encode/decode with AWGN
channel model in files .\ldpc_decode.m and .\GFq\ldpc_decode.m.
There are a few parity check matrices available in the code but
you can use other matrices provided you have enough memory to load
them. I suggest checking out matrices in Alist format available on
David MacKay s web site.You will need to have access to a MEX compiler
to be able to use a few functions written in C.
LDPC的仿真代碼
acm HDOJ 1051WoodenSticks
Description:
There is a pile of n wooden sticks. The length and weight of each stick are known in advance. The sticks are to be processed by a woodworking machine in one by one fashion. It needs some time, called setup time, for the machine to prepare processing a stick. The setup times are associated with cleaning operations and changing tools and shapes in the machine. The setup times of the woodworking machine are given as follows:
(a) The setup time for the first wooden stick is 1 minute.
(b) Right after processing a stick of length l and weight w , the machine will need no setup time for a stick of length l and weight w if l<=l and w<=w . Otherwise, it will need 1 minute for setup.
There are some other approaches, such as Schedule Network Templates, dependency Determination, and Applying Leads and Lags. They are also use with PDM and ADM together for sequencing activities. Based on the different size or type of project, the managers should choose suitable approaches.