亚洲欧美第一页_禁久久精品乱码_粉嫩av一区二区三区免费野_久草精品视频

蟲蟲首頁| 資源下載| 資源專輯| 精品軟件
登錄| 注冊

mine

  • Guidelines+for+Electrical+Transmission+Line

    Since the original publication of Manual 74 in 1991, and the preceding “Guidelines for Transmission Line Structural Loading” in 1984, the understanding of structural loadings on transmission line structures has broadened signifi cantly. However, improvements in computational capa- bility have enabled the transmission line engineer to more easily deter- mine structural loadings without properly understanding the parameters that affect these loads. Many seasoned professionals have expressed concern for the apparent lack of recent information on the topic of struc- tural loadings as new engineers enter this industry. The Committee on Electrical Transmission Structures is charged with the responsibility to report, evaluate, and provide loading requirements of transmission struc- tures. This task committee was therefore formed to update and revise the 1991 manual.

    標簽: Transmission Guidelines Electrical Line for

    上傳時間: 2020-06-07

    上傳用戶:shancjb

  • 使用InnoSwitch3-Pro PowiGaN PPS電源的65 W USB PD 3.0

    使用InnoSwitch3-Pro PowiGaN和mine-CAP的3.3 W-21 V PPS電源的65 W USB PD 3.0

    標簽: InnoSwitch3-Pro PowiGaN PPS電源

    上傳時間: 2022-04-02

    上傳用戶:kingwide

主站蜘蛛池模板: 横山县| 岢岚县| 班戈县| 习水县| 浦北县| 上高县| 大悟县| 榆社县| 集安市| 颍上县| 墨脱县| 美姑县| 教育| 永德县| 周至县| 二手房| 康定县| 清河县| 彭州市| 出国| 紫阳县| 鹰潭市| 莱西市| 邻水| 宝鸡市| 寻乌县| 宿州市| 施秉县| 隆尧县| 临泽县| 姚安县| 辽宁省| 和田县| 普格县| 嘉禾县| 赣榆县| 耒阳市| 永清县| 唐海县| 富锦市| 西青区|