keil and proteus聯合演示顯示效果,可實現音樂的播放,對初學者比較有用;很好的例子
上傳時間: 2013-09-25
上傳用戶:yangqian
the practice of proteus and avr
上傳時間: 2013-09-29
上傳用戶:tom_man2008
Abstract: Using a wafer-level package (WLP) can reduce the overall size and cost of your solution.However when using a WLP IC, the printed circuit board (PCB) layout can become more complex and, ifnot carefully planned, result in an unreliable design. This article presents some PCB designconsiderations and general recommendations for choosing a 0.4mm- or 0.5mm-pitch WLP for yourapplication.
標簽: Considerations Guidelines and Design
上傳時間: 2013-10-14
上傳用戶:ysystc699
PADS-PowerLogic and PowerPcb實用教程
標簽: PADS-PowerLogic PowerPcb and 實用教程
上傳時間: 2014-12-24
上傳用戶:youmo81
Silicon Motion, Inc. has made best efforts to ensure that the information contained in this document is accurate andreliable. However, the information is subject to change without notice. No responsibility is assumed by SiliconMotion, Inc. for the use of this information, nor for infringements of patents or other rights of third parties.Copyright NoticeCopyright 2002, Silicon Motion, Inc. All rights reserved. No part of this publication may be reproduced, photocopied,or transmitted in any form, without the prior written consent of Silicon Motion, Inc. Silicon Motion, Inc. reserves theright to make changes to the product specification without reservation and without notice to our users
標簽: GUIDELINES LAYOUT 320 PCB
上傳時間: 2014-12-24
上傳用戶:zhaistone
The LTP5901 and LTP5902 require little external circuitry, as the devices references,decoupling and power supply filtering are integrated. The LTP5901 and LTP5902 will bemodularly certified for operation in the United States (FCC), Canada (IC) and theEuropean Union (CE).
標簽: Integration LTP Hardware Guide
上傳時間: 2013-11-22
上傳用戶:sunchao524
To this day, Power over Ethernet (PoE) continues to gainpopularity in today’s networking world. The 12.95Wdelivered to the Powered Device (PD) input supplied bythe Power Sourcing Equipment (PSE) is a universal supply.Each PD provides its own DC/DC conversion from anominal 48V supply, thus eliminating the need for a correctvoltage wall adapter. However, higher power devicescan not take advantage of standard PoE because of itspower limitations, and must rely on a large wall adapteras their primary supply. The new LTC4268-1 breaks thispower barrier by allowing for power of up to 35W for suchpower-hungry 2-pair PoE applications. The LTC4268-1provides a complete solution by integrating a high powerPD interface control with an isolated fl yback controller.
上傳時間: 2014-12-24
上傳用戶:jasson5678
Avalanche photo diode (APD) receiver modules arewidely used in fi ber optic communication systems. AnAPD module contains the APD and a signal conditioningamplifi er, but is not completely self contained. It stillrequires signifi cant support circuitry including a highvoltage, low noise power supply and a precision currentmonitor to indicate the signal strength. The challenge issqueezing this support circuitry into applications withlimited board space. The LT®3482 addresses this challengeby integrating a monolithic DC/DC step-up converter andan accurate current monitor. The LT3482 can supportup to a 90V APD bias voltage, and the current monitorprovides better than 10% accuracy over four decades ofdynamic range (250nA to 2.5mA).
上傳時間: 2014-01-18
上傳用戶:wenyuoo
As environmental concerns over traditional lighting increaseand the price of LEDs decreases, high power LEDsare fast becoming a popular lighting solution for offl ineapplications. In order to meet the requirements of offl inelighting—such as high power factor, high effi ciency, isolationand TRIAC dimmer compatibility—prior LED driversused many external discrete components, resulting incumbersome solutions. The LT®3799 solves complexity,space and performance problems by integrating all therequired functions for offl ine LED lighting.
上傳時間: 2013-10-13
上傳用戶:dongqiangqiang
為了改變目前電網現場作業管理的變電巡檢、變電檢修試驗、輸電線路巡檢檢修等管理系統各自獨立運行,信息不能共享,功能、效率受限,建設和維護成本高的現狀,提出了采用B/S+C/S構架模式,將各現場作業管理模塊和生產MIS(管理系統)集成為一體的現場作業管理系統的設計方案,做到各子系統和生產MIS軟硬資源共享,做到同一數據唯一入口、一處錄入多處使用。各子系統設備人員等基礎信息來源于生產管理系統,各子系統又是生產管理系統的作業數據、缺陷信息的重要來源。經過研究試用成功和推廣應用,目前該系統已在江西電網220 kV及以上變電站全面應用。 Abstract: In order to improve the status that the substation field inspection system, substation equipments maintenance and testing system, power-line inspection and maintenance system are running independent with each other. They can?蒺t share the resource information which accordingly constrains their functions and efficiency, and their construction and maintenance costs are high. This paper introduces a field standardized work management system based on B/S+C/S mode, integrating all field work management systems based on MIS and share the equipments and employee?蒺s data of MIS,the field work data of the sub systems are the source information of MIS, by which the same single data resouce with one-time input can be utilized in multiple places. After the research and testing, this system is triumphantly using in all 220kV and above substations in Jiangxi grid.
上傳時間: 2013-11-15
上傳用戶:han_zh