run in matlab 6.0 or above UWB channel simulink .
標簽: simulink channel matlab above
上傳時間: 2014-01-20
上傳用戶:cxl274287265
Redistributions of source code must retain the above copyright notice, this list of conditions and the following disclaimer.
標簽: Redistributions conditions copyright notice
上傳時間: 2015-11-28
上傳用戶:chenlong
- Redistributions in binary form must reproduce the above copyright notice, this list of conditions and the disclaimer below in the documentation and/or other materials provided with the distribution.
標簽: Redistributions copyright condition reproduce
上傳時間: 2013-12-30
上傳用戶:牛津鞋
Please unzip the file and make the file under linux with version 2.6 or above. The function is just like the utility traceroute in linux or tracert in windows.
上傳時間: 2014-01-13
上傳用戶:h886166
Refer to the UML diagram above and implement the Course class. After you define the Course class, you must create a Course object with the following details: Programming I, WXES1114, taught by SMT. Besides, your program must test all the accessor and mutator methods you had defined and the toString() method. toString() method is a special method inherited from the Object class. You have to override this method to display all the information about a course.
標簽: Course the class implement
上傳時間: 2014-01-26
上傳用戶:cx111111
The last step in training phase is refinement of the clusters found above. Although DynamicClustering counters all the basic k-means disadvantages, setting the intra-cluster similarity r may require experimentation. Also, a cluster may have a lot in common with another, i.e., sequences assigned to it are as close to it as they are to another cluster. There may also be denser sub-clusters within the larger ones.
標簽: DynamicClusteri refinement Although clusters
上傳時間: 2014-01-04
上傳用戶:watch100
driver program which uses the above two modules. I have also made available the data set pollute.dat of mortality rates against socio-economic, meteorological and pollution variables for 60 statistical areas in the USA.
標簽: available the program modules
上傳時間: 2017-07-28
上傳用戶:wff
Abstract: Most magnetic read head data sheets do not fully specify the frequency-dependent components andare often vague when specifying other key parameters. In some cases, the specifications of two very similarheads from two different manufacturers might be quite different in terms of parameters specified and omitted.The limitations in the data sheets make designing an optimum card reading system unnecessarily difficult andtime consuming. This document outlines a strategy to overcome the above shortcomings and offers guidelinesto overcome the noise issues.
上傳時間: 2013-11-13
上傳用戶:dysyase
The above title is not happenstance and was arrived at afterconsiderable deliberation. As a linear IC manufacturer, it isour goal to encourage users to design and build switchingregulators. A problem is that while everyone agrees thatworking switching regulators are a good thing, everyonealso agrees that they are difficult to get working. Switchingregulators, with their high efficiency and small size, areincreasingly desirable as overall package sizes shrink.Unfortunately, switching regulators are also one of themost difficult linear circuits to design. Mysterious modes,sudden, seemingly inexplicable failures, peculiar regulationcharacteristics and just plain explosions are commonoccurrences. Diodes conduct the wrong way. Things gethot that shouldn’t. Capacitors act like resistors, fusesdon’t blow and transistors do. The output is at ground, andthe ground terminal shows volts of noise.
標簽: Regulators Switching Poets for
上傳時間: 2013-12-19
上傳用戶:奇奇奔奔
為了改變目前電網現場作業管理的變電巡檢、變電檢修試驗、輸電線路巡檢檢修等管理系統各自獨立運行,信息不能共享,功能、效率受限,建設和維護成本高的現狀,提出了采用B/S+C/S構架模式,將各現場作業管理模塊和生產MIS(管理系統)集成為一體的現場作業管理系統的設計方案,做到各子系統和生產MIS軟硬資源共享,做到同一數據唯一入口、一處錄入多處使用。各子系統設備人員等基礎信息來源于生產管理系統,各子系統又是生產管理系統的作業數據、缺陷信息的重要來源。經過研究試用成功和推廣應用,目前該系統已在江西電網220 kV及以上變電站全面應用。 Abstract: In order to improve the status that the substation field inspection system, substation equipments maintenance and testing system, power-line inspection and maintenance system are running independent with each other. They can?蒺t share the resource information which accordingly constrains their functions and efficiency, and their construction and maintenance costs are high. This paper introduces a field standardized work management system based on B/S+C/S mode, integrating all field work management systems based on MIS and share the equipments and employee?蒺s data of MIS,the field work data of the sub systems are the source information of MIS, by which the same single data resouce with one-time input can be utilized in multiple places. After the research and testing, this system is triumphantly using in all 220kV and above substations in Jiangxi grid.
上傳時間: 2013-11-15
上傳用戶:han_zh