亚洲欧美第一页_禁久久精品乱码_粉嫩av一区二区三区免费野_久草精品视频

蟲(chóng)蟲(chóng)首頁(yè)| 資源下載| 資源專輯| 精品軟件
登錄| 注冊(cè)

responsibility

  • System Requirements Analysis

    The serious study of the practice of how to determine the appropriate content of a specification is a seldom-appreciated pastime. Those who have the responsibility to design a product would prefer a greater degree of freedom than permitted by the con- tent of a specification. Many of those who would manage those who would design a product would prefer to allocate all of the project funding and schedule to what they consider more productive labor. These are the attitudes, of course, that doom a project to defeat but they are hard to counter no matter how many times repeated by design engineers and managers. A system engineer who has survived a few of these experiences over a long career may retire and forget the past but we have an endur- ing obligation to work toward changing these attitudes while trying to offer younger system engineers a pathway toward a more sure success in requirements analysis and specification publishing.

    標(biāo)簽: Requirements Analysis System

    上傳時(shí)間: 2020-06-01

    上傳用戶:shancjb

  • Guidelines+for+Electrical+Transmission+Line

    Since the original publication of Manual 74 in 1991, and the preceding “Guidelines for Transmission Line Structural Loading” in 1984, the understanding of structural loadings on transmission line structures has broadened signifi cantly. However, improvements in computational capa- bility have enabled the transmission line engineer to more easily deter- mine structural loadings without properly understanding the parameters that affect these loads. Many seasoned professionals have expressed concern for the apparent lack of recent information on the topic of struc- tural loadings as new engineers enter this industry. The Committee on Electrical Transmission Structures is charged with the responsibility to report, evaluate, and provide loading requirements of transmission struc- tures. This task committee was therefore formed to update and revise the 1991 manual.

    標(biāo)簽: Transmission Guidelines Electrical Line for

    上傳時(shí)間: 2020-06-07

    上傳用戶:shancjb

  • NIST Framework and Roadmap

    Under the Energy Independence and Security Act of 2007 (EISA), the National Institute of Standards and Technology (NIST) was assigned “primary responsibility to coordinate development of a framework that includes protocols and model standards for information management to achieve interoperability of Smart Grid devices and systems…” [EISA Section 1305]. 35 This responsibility comes at a time when the electric power grid and electric power industry are undergoing the most dramatic transformation in many decades. Very significant investments are being made by industry and the federal government to modernize the power grid. To realize the full benefits of these investments—and the continued investments forecast for the coming decades—there is a continued need to establish effective smart grid 36 standards and protocols for interoperability.

    標(biāo)簽: Framework Roadmap NIST and

    上傳時(shí)間: 2020-06-07

    上傳用戶:shancjb

主站蜘蛛池模板: 冷水江市| 松桃| 桐柏县| 屏山县| 中西区| 广南县| 土默特右旗| 防城港市| 赣榆县| 辰溪县| 揭东县| 宁波市| 洛扎县| 寿阳县| 正蓝旗| 基隆市| 阿鲁科尔沁旗| 大田县| 新晃| 罗甸县| 福清市| 晴隆县| 诏安县| 鹤庆县| 虹口区| 许昌县| 三亚市| 肇庆市| 新乡县| 金川县| 华亭县| 英超| 海晏县| 卓尼县| 蓬莱市| 普定县| 会东县| 文山县| 潜山县| 郯城县| 台湾省|