THE INFORMATION PROVIDED IN THE MICROSOFT KNOWLEDGE BASE IS
PROVIDED "AS IS" WITHOUT WARRANTY OF ANY KIND. MICROSOFT DISCLAIMS
ALL WARRANTIES, EITHER EXPRESS OR IMPLIED, INCLUDING THE WARRANTIES
OF MERCHANTABILITY AND FITNESS FOR A PARTICULAR PURPOSE. IN NO
EVENT SHALL MICROSOFT CORPORATION OR ITS SUPPLIERS BE LIABLE FOR
ANY DAMAGES WHATSOEVER INCLUDING DIRECT, INDIRECT, INCIDENTAL,
CONSEQUENTIAL, LOSS OF BUSINESS PROFITS OR SPECIAL DAMAGES, EVEN IF
MICROSOFT CORPORATION OR ITS SUPPLIERS HAVE BEEN ADVISED OF THE
POSSIBILITY OF SUCH DAMAGES. SOME STATES DO NOT ALLOW THE EXCLUSION
OR LIMITATION OF LIABILITY FOR CONSEQUENTIAL OR INCIDENTAL DAMAGES
SO THE FOREGOING LIMITATION MAY NOT APPLY.
pitch=CorrelogramPitch(correlogram, width [, sr, lowPitch, highPitch])
computes the pitch of a correlogram sequence by finding the time lag
with the largest correlation energy.
ACM試題Problem K:Ones
Description
Given any integer 0 <= n <= 10000 not divisible by 2 or 5, some multiple of n is a number which in decimal notation is a sequence of 1 s. How many digits are in the smallest such a multiple of n?
This section contains a brief introduction to the C language. It is intended as a tutorial on the language, and aims at getting a reader new to C started as quickly as possible. It is certainly not intended as a substitute for any of the numerous textbooks on C. 2. write a recursive function FIB (n) to find out the nth element in theFibanocci sequence number which is 1,1,2,3,5,8,13,21,34,55,…3. write the prefix and postfix form of the following infix expressiona + b – c / d + e * f – g * h / i ^ j4. write a function to count the number of nodes in a binary tr
*
* THIS SOFTWARE IS PROVIDED BY THE AUTHOR ``AS IS AND ANY EXPRESS
* OR IMPLIED WARRANTIES, INCLUDING, BUT NOT LIMITED TO, THE IMPLIED
* WARRANTIES OF MERCHANTABILITY AND FITNESS FOR A PARTICULAR PURPOSE
* ARE DISCLAIMED. IN NO EVENT SHALL THE AUTHOR BE LIABLE FOR ANY
* DIRECT, INDIRECT, INCIDENTAL, SPECIAL, EXEMPLARY, OR CONSEQUENTIAL
* DAMAGES (INCLUDING, BUT NOT LIMITED TO, PROCUREMENT OF SUBSTITUTE
* GOODS OR SERVICES LOSS OF USE, DATA, OR PROFITS OR BUSINESS
* INTERRUPTION) HOWEVER CAUSED AND ON ANY THEORY OF LIABILITY,
* WHETHER IN CONTRACT, STRICT LIABILITY, OR TORT (INCLUDING
* NEGLIGENCE OR OTHERWISE) ARISING IN ANY WAY OUT OF THE USE OF THIS
* SOFTWARE, EVEN IF ADVISED OF THE POSSIBILITY OF SUCH D
/* Check_SST_39VF400A Check manufacturer and device ID
/* CFI_Query CFI Query Entry/Exit command sequence
/* Erase_One_Sector Erase a sector of 2048 words
/* Erase_One_Block Erase a block of 32K words
/* Erase_Entire_Chip Erase the contents of the entire chip
/* Program_One_Word Alter data in one word
/* Program_One_Sector Alter data in 2048 word sector
/* Program_One_Block Alter data in 32K word block
* "Copyright (c) 2006 Robert B. Reese ("AUTHOR")"
* All rights reserved.
* (R. Reese, reese@ece.msstate.edu, Mississippi State University)
* IN NO EVENT SHALL THE "AUTHOR" BE LIABLE TO ANY PARTY FOR
* DIRECT, INDIRECT, SPECIAL, INCIDENTAL, OR CONSEQUENTIAL DAMAGES ARISING OUT
* OF THE USE OF THIS SOFTWARE AND ITS DOCUMENTATION, EVEN IF THE "AUTHOR"
* HAS BEEN ADVISED OF THE POSSIBILITY OF SUCH DAMAGE.
Each arc of a binary-state network has good/bad states. The system reliability, the probability
that source s communicates with sink t, can be computed in terms of minimal paths (MPs). An
MP is an ordered sequence of arcs from s to t that has no cycle. Note that a minimal path is
different from the so-called minimum path. The latter is a path with minimum cost.